How to Determine Optimal Stock in Production
DOI:
https://doi.org/10.37886/Keywords:
production, inventories, optimize inventories, optimize, order, study supplies, determining, EOQ modelAbstract
RQ: The purpose of the research was to determine the optimal ordering of materials in production, time of ordering and calculating the cost.
Purpose: Determination of the optimal order quantity, time and cost of concrete material and optimize the organization and storage.
Method: Method of data collection was secondary theoretical sources and data collection on projected needs and value of materials as well as data analysis with EOQ model calculations.
Results: The optimal amount of screws was calculated that was estimated at 36,000 pieces that can be ordered every 28 days. In addition, the annual costs of maintaining inventories were calculated to € 357.77.
Organization: By optimizing inventory, stock increases are prevented as well as production halts are avoided.
Society: Introducing the system of optimization and implementing it into practice.
Originality: Originality is in presenting a concrete case of using the EOQ model.
Limitations: Unexpected increase in capacity due to increased demand, inventory stock and state of finances.
References
1. Corbey, M., & Jansen, R. (1993). The economic lot size and relevant costs. International Journel of Production Economics, 30-31, 519–530. doi: 10.1016/0925-5273(93)90117-4
2. Čižman, A. (2002). Logistični management v organizaciji. Kranj: Moderna organizacija.
3. Fabijan, M. (2012). Optimizacija zalog v trgovskem podjetju (Diplomska naloga). Nova gorica: Poslovno tehniška fakulteta.
4. Ganeshan, R. (1999). Managing supply chain inventories: A multiple retailer, one warehouse, multiple supplier model. International Journal Production Economics, 59(1/3), 341–354. doi: 10.1016/S0925-5273(98)00115-7
5. Jakšič, M., & Rusjan, B. (2007). Učinek biča v oskrbni verigi. Katedra za management in organizacijo, Ekonomska fakulteta Univerze v Ljubljani,40, 17–24.
6. Kaltnekar, Z. (1996). Organizacija delovnih procesov. Kranj: Moderna organizacija.
7. Kavčič, B. (2000). Upravljanje proizvodnje. Novo mesto: Visoka šola za upravljanje in poslovanje.
8. Lušina, P. (2009). Optimizacija nabave v proizvodnem podjetju (Diplomska naloga). Koper: Fakulteta za managent.
9. Min, W., & Pheng, L. S. (2004). Economic order quantity (EOQ) versus just in time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry. Construction Management & Economics, 23(4), 409–422. doi: 10.1080/01446190500041339
10. Rusjan, B. (1999). Management proizvodnje. Ljubljana: Ekonomska fakulteta.